Sealing Lagoons

Sealing Sewage and Wastewater lagoons

ESS-13 is pumped or poured directly into the water at a pre-determined application rate. The seepage in your pond will decrease 60% to 90% initially, and this original rate will continue to improve with time.

Waterborne Method

Click here for more information

The ESS-13 “Spray-On Formulation” can save 75% or more off the installation costs of other lake sealing methods.

Spray-On Method

Click here for more information.

ESS-13 is pre-mixed with our E-13 compaction aid, pumped in pre-measured quantities into the soil with conventional earth moving equipment. The treated soil is then compacted in two consecutive six inch layers.

Treated and Compacted Method

Click here for more information.

Address:
115 S. Weber Drive Suite 2
Chandler, AZ 85226  USA 

Toll Free Phone: 
    1.800.214.9640
Local Phone:
    480.763.1180
Fax: 480.763.1182

info@seepagecontrol.com

 

 

SPRAY-ON INSTALLATION

Your purchase of the ESS-13 Spray-On formulation includes on-site technical representation during the installation process by an SCI Installation Specialist. The ESS-13 Spray-On application is most effective if applied during a rain-free period from the start of the project until the pond is full. Temperatures during the entire sub-grade preparation and installation need to be above freezing.
The following are our basic instructions. Please consult with your sales rep for more specific information pertaining to your project.
Click on the Images for a Larger View.

Waterborne Installation Step 1The sub-grade shall be free of rock outcrops or other foreign debris. Any areas that are predominantly sand or gravel should be over-excavated by a minimum of six inches and replaced with an approved soil.

 

 

Waterborne Installation Step 1The ESS-13 Spray-on application is most easily applied with a water truck, but other spray equipment is acceptable. The product will arrive on-site in 55-gallon drums. The product should be transferred from the drums into the water truck under the direction of the on-site Seepage Control Field Representative. The product should then be sprayed on to the prepared sub-grade starting at the top of the slope, working downward. It is important that the spray is uniform, covers the entire area, and is not at a rate that causes erosion. The product is to be applied in repeated light applications that build on each other. Once the sub-grade is thoroughly covered, the application is complete.

Waterborne Installation Step 1The sprayed-on liner should be allowed to air dry for 1 to 3 days, depending on weather conditions.

 

 

Waterborne Installation Step 1It is then covered with a layer of moisturized and compacted soil. To prevent desiccation, cracking or drying out during and after placement, the soil liner shall be kept moist until the lake is filled.



Waterborne Installation Step 1The lake can then be filled. Precautions need to be taken during filling to prevent erosion of the soil liner.

 

 

Waterborne Installation Step 1Please mention as many details about your particular project to your Seepage Control representative.